The President's News Conference
03/14/1929
https://www.presidency.ucsb.edu...
The estimated cost of the buildings thereon is $31,133,500.
At the first of this month there were 100 projects in which the sites have been determined upon and are in process of being acquired.
There are 64 projects in which sites have been arranged, drawings are completed, for which construction contracts have been invited, of a to...
Sixteen buildings have been completed during the months of September and October.