10/26/2009
https://www.congress.gov...
"Second, he also said that PG&E's own analysis showed that the newly discovered faults could cause ground shaking that was 70 percent stronger than the NRC license allows."
"It is about openness and transparency; it is about safety; it is about accountability."
"One, NRC's former senior resident inspector for Diablo Canyon filed a formal dissent, saying that Diablo was operating outside the seismic requirements of its license."
"We are also going to look at the 12 recommendations that were made post-Fukushima for safety."