today I am introducing a bipartisan, noncontroversial, technical provision pertaining to two proposed hydroelectric projects at U.S. Army Corps of Engineers dams in Virginia. This bill would give the Federal Energy Regulatory Commission, FERC, authority to extend commence-construction deadlines for the 3.7 MW project at Gathright Dam, FERC Project No. 12737, and the 1.8 MW project at Flannagan Dam, FERC Project No. 12740. The timelines for these projects have been set back due to challenges with securing Army Corps permits. FERC does not oppose this legislation, as the requested extensions are still within the overall 10-year window for extension of licensing deadlines. There is no known local opposition. This provision was passed by the Senate last year as part of the Energy Policy Modernization Act, S. 2012. It was also introduced in the House by Representative Morgan Griffith and passed the full House separately. I am pleased to reintroduce the bill again today and hope the Energy & Natural Resources Committee and the full Senate will consider it soon. ______ By Mrs. FEINSTEIN (for herself and Ms. Harris): S. 731. A bill to establish the Sacramento-San Joaquin Delta National Heritage Area; to the Committee on Energy and Natural Resources.
On the recordMarch 27, 2017
Share
More from Tim Kaine
Jul 22, 2026
Instead of ending this war and finally easing the burden that he has placed on American families, Trump is calling off the ceasefire, trading airstrikes with Iran, and blockading the Strait of Hormuz.
Jul 21, 2026
I’m thrilled that $16 million is headed to the Virginia Advanced Pharma Manufacturing Cluster to support the domestic manufacturing of critical medicines, boost our supply chains, and grow our regional economy.
Aug 7, 2026
We don’t have to imagine the negative consequences this policy will have on the health and well-being of our communities, because when President Trump previously instituted a similar policy, it led to widespread avoidance of medical care…





