Senator Levin inquires about the work shifts for HMMWV armoring.
02/04/2004
https://www.congress.gov...
So you entered into a deal that said they would cancel as soon as possible, but that was not in your interest?
The queue then is significantly in your control, the length of the queue.
It is a 2-year wait. That is the answer.
Red Kite cancels 150,000 metric tons of aluminum immediately.