06/11/2013
https://congress.gov...
"assuming that ITER succeeds and that sometime around 2025, 2030, would succeed at everything including DT--the DT program, what are the--going to be the remaining unsolved problems?"
"I think I'm probably the only Member of Congress that's designed and built a 100,000-ampere superconducting power transmission line."
"When the United States signed up for the project, the representation was made that this project was ready to go."
"Thank you. I also want to thank you for your supportive words about Argonne's Advanced Photon Source to Mr. Lipinski, and I look forward to continuing to work with my colleagues to make sure that the ..."