We all lose, and importantly each and every one of our constituents lose, if we aren't able to pass this bill.
On the public record
All Quotes
Every politician on the site, every statement on file. Search, filter, and read the public record.
60,000+·quotes on file
I hope this Committee will take direction from the Army Corps of Engineers, who requested this increase in authorization.
I want to express my support for two projects under their administration and oversight in North Carolina's First Congressional District--the Tar-Pamlico River Basin project and the Princeville, North Carolina project.
Flooding is a recurring issue in eastern North Carolina due to frequent hurricanes, tropical storms, and heavy rainfall.
To that end, consistent with IIJA congressional intent, I request that the Committee adjust funding levels to ensure that the federal government continues to cover 100 percent of the cost.
I, alongside Senators Durbin and Duckworth, request that Congress directs the USACE to complete a Reevaluation Report for the East St. Louis, and Vicinity, Illinois Ecosystem Restoration and Flood Damage Reduction Project.
I request that we adjust funding levels to ensure that the Federal Government continues to cover 100 percent of the cost of the seven inland waterways construction and major rehabilitation projects.
By adding stormwater management to the existing scope of water and wastewater infrastructure assistance, the Army Corps of Engineers will have increased ability to remedy flooding issues as they arise.
In WRDA 2024, I am requesting a feasibility study of the Spring Lake Project recommended in the East St. Louis and Vicinity Ecosystem Restoration and Flood Damage Reduction Project report.
I was proud to secure an EPA coordinator to help us resolve this issue, and the Army Corps of Engineers has worked collaboratively with the State of Illinois to address this in the past.
I have the honor of serving communities outside of St. Louis in the Metro East region, communities that have struggled with the consequences of inadequate infrastructure for far too long.
Addressing these challenges is essential in safeguarding our communities and enhancing the resilience of eastern North Carolina against the detrimental effects of flooding.
Unless modified in WRDA 2024, the disparity between projected costs reflect in IIJA funding levels and subsequent real world project costs threatens to jeopardize and delay critical ongoing and planned capital improvements.
I staunchly oppose the inclusion of any language in WRDA which would operationally or physically breach the Lower Snake River Dams.
I also request, alongside our Illinois senators, modification to the scope and authorization ceiling for Madison and St. Clair Counties, Illinois.
The Mississippi River also serves as a vital waterway to growers and producers in my congressional district, allowing them to get their goods to market.
Thank you for the opportunity to discuss VA's efforts to best serve Veterans living in rural communities.
I appreciate Ranking Member Takano and the members of the Committee for standing shoulder to shoulder with me in a bipartisan manner to do that.